Water Field GuideProvider, supply, rates and the fee heading to a hearing

Queen Creek Water: Who Supplies It, Where It Comes From and What It Costs

Most Queen Creek addresses buy water from the Town of Queen Creek Water Division, a municipal utility rather than a private water company, at 22358 S. Ellsworth Road, 480-358-3450, Monday through Thursday, 7 a.m. to 6 p.m. It pumps from 29 active drinking-water wells plus recovered surface water, and the Town puts its Colorado River reliance at “minimal… approximately 10%” of supply. Not every address that reads “Queen Creek” is on that system: EPCOR serves parts of the area, and the Town runs the separately rated Diversified Water Service Area in east San Tan Valley.

This is the water half of the Queen Creek utilities setup guide: who bills which address, what the Town charges per 1,000 gallons as of September 2026, what the proposed Water Resource Fee would change, and what the assured-water-supply paperwork does and does not say.

Every figure below carries its date and its source. On two points the Town’s own pages contradict each other — what the CAGRD offset has saved customers, and when the 2025 rate increase took effect — and both versions are printed rather than one.

By The Queen Creek Local Desk · Last verified: September 2026

Key Facts at a Glance
Last verified:September 2026
Who Bills You
Town of Queen Creek
Utilities Dept., 480-358-3450; EPCOR serves parts of the area
Active Wells
29
2025 Annual Water Quality Report
Colorado River Share
~10% of supply
Town of Queen Creek, September 2026
Minimum Monthly Charge
$21.08
3/4-inch meter, includes first 1,000 gallons, September 2026
Water Hardness
6–17 grains/gal
Town water FAQ, September 2026
Proposed Water Resource Fee
$3.07 / 1,000 gal
Proposed Year 1 rate, not adopted; hearing Nov. 18, 2026
Verdict

The Honest Queen Creek Water Verdict

Most Queen Creek addresses are on Town water: $21.08 a month minimum on a 3/4-inch meter plus $2.04 per 1,000 gallons, drawn from 29 active wells and recovered surface water. The 2025 Annual Water Quality Report records no violations for any contaminant it tested, which is not the same as calling the water clean: hardness, naturally occurring fluoride and chlorine are all present and measured. The Town has spent heavily to buy supply it does not have to pump locally: it says it approved funding a second, larger Harquahala Valley purchase of 1.2 million acre-feet for $244.4 million in late 2025, and sold the certificates of participation that pay for it on January 15, 2026. The Town totals its two 2025 purchases at 1.7 million acre-feet; no delivery date for that water is published. What is already on bills is the 15% increase Council approved on July 16, 2025. The Water Resource Fee that would move the CAGRD charge onto the water bill is proposed, not adopted.
Who it fits: Households comparing monthly utility budgets across the East Valley, and buyers of existing homes who want a documented 100-year assured water supply certificate rather than a reassuring sentence in a brochure.
Who should choose elsewhere: Anyone buying raw or newly platted land should slow down — roughly 10,000 approved single-family homes in town carry no assured water supply certificate yet. Anyone who wants soft water straight from the tap should budget for treatment, because hardness runs 6 to 17 grains per gallon.
The one catch: The CAGRD charge that about 89% of customers pay on their property tax bill is proposed to move onto the water bill instead, as a Water Resource Fee of $3.07 per 1,000 gallons — $30.70 a month gross at 10,000 gallons of use, or $18.42 after the 40% residential and schools wastewater credit. It is not adopted; the public hearing, with possible Council action, is Nov. 18, 2026.

Queen Creek Water at a GlanceOfficial & Verified Data

Water Division Contacts (September 2026)
Utilities and after-hours emergency
480-358-3450
Water quality questions
480-358-3459
Conservation programs
480-358-3455
Office
22358 S. Ellsworth Road, Queen Creek, AZ 85142
Counter hours
Monday–Thursday, 7 a.m.–6 p.m.; closed Friday–Sunday
Bill payments by mail
P.O. Box 29014, Phoenix, AZ 85038-9014
Supply and System
Active drinking-water wells
29, per the 2025 Annual Water Quality Report
Colorado River share of supply
Approximately 10%, per the Town
Local groundwater dependence
The Town says the combined Harquahala purchases bring its portfolio to “90% drought-proof and only 6% reliant on local groundwater pumping”; the Town’s own characterization, May 2026, not a measurement of today’s mix
Harquahala Valley purchases
Two 2025 purchases the Town totals at 1.7 million acre-feet: 500,000 acre-feet, then an additional 1.2 million acre-feet the Town says it approved funding in late 2025 for $244.4 million and financed in January 2026
Storage
3-million-gallon facility completed 2020; two more under construction as of September 2026
Service area growth
36 to 69 square miles over the past 15 years
Quality and Hardness (2025 report and Town FAQ)
Violations recorded
None for any tested contaminant, per the 2025 report
Hardness
6–17 grains per gallon town-wide, per the Town’s water FAQ
Fluoride
Naturally occurring, 0.4–0.6 ppm on the Town’s FAQ; the 2025 report’s own range is non-detect to 0.70 ppm, average 0.55 ppm
Lead service lines
None requiring replacement; ADEQ lead-free validation waiver
Disinfection
A small amount of chlorine added at entry points

1.Who Supplies Water at a Queen Creek Address

There are only three answers, and which one applies depends on where the meter sits, not on the mailing city: the Town of Queen Creek Water Division, the Town-operated Diversified Water Service Area, or EPCOR. To settle it for one property, call the Town’s Utilities Department at 480-358-3450 with the street address, Monday through Thursday, 7 a.m. to 6 p.m. A “Queen Creek, AZ” postal address is no proof of Town water service — background on why sits with the ZIP codes carrying a Queen Creek address and which county the parcel is in.

Water providers in and around Queen Creek (September 2026)
ProviderWhat it isWhere it servesRate structure
Town of Queen Creek Water DivisionMunicipal utility run by the TownMost of incorporated Queen CreekTiered; 15% increase approved July 16, 2025
Diversified Water Service AreaTown-operated since Oct. 2, 2020, on its legacy scheduleEast San Tan Valley, outside Queen Creek town limitsFlat $3.65 per 1,000 gal; not part of the 2025 increase
EPCOR, San Tan Water and WastewaterPrivate utility; the ACC named it interim operator of Johnson Utilities in summer 2018, and EPCOR completed the purchase Jan. 29, 2021Parts of Queen Creek, San Tan Valley and Anthem in FlorenceEPCOR’s own schedule, not the Town’s
H2O, Inc.Historical only; Council approved buying it June 19, 2013Folded into the Town systemNot a separate provider
Heads up

The Town’s Resident Resources page still carries a note about addresses “receiving water service from H2O, Inc.” getting a separate trash bill, as published in September 2026. H2O stopped being an independent water utility after voters approved the purchase 2,550 to 379 and the Council signed off on June 19, 2013. A listing sheet that puts a Queen Creek home on H2O water is more than a decade out of date.

The Town and EPCOR also traded territory. The Arizona Corporation Commission approved a service-area exchange on Dec. 6, 2022, and on July 1, 2023 the Town became the sole wastewater provider for Encanterra, Ironwood Crossing, the Germann 516/PRI property and a commercial pocket near Ironwood Medical Center. Undeveloped Bella Vista Farms North went to EPCOR. The Town stated that “no current Queen Creek water customers are being transferred to EPCOR.”

The Town’s water service area has nearly doubled in 15 years, from 36 to 69 square miles, and the Town credits acquiring the H2O, Inc. system in 2013 and Diversified in 2020 more than new subdivisions.

2.Where Queen Creek Gets Its Water

The Town’s 2025 Annual Water Quality Report describes the supply as “recovered surface water and groundwater,” pumped from “29 active drinking water wells located throughout the water distribution system,” with a small amount of chlorine added at entry points. That is the day-to-day answer; the longer one is a portfolio assembled deal by deal. August 2019 is when the Town’s first Colorado River transfer was proposed, not bought: the Town announced a $24 million payment and began receiving that water in 2023, and the Harquahala purchases came in 2025.

Queen Creek’s water sources, in the Town’s own words (September 2026)
SourceWhat the Town says about itAs of
Local groundwater, 29 active wellsThe Town says the Harquahala purchases bring its portfolio to “90% drought-proof and only 6% reliant on local groundwater pumping”; its own characterization, not a measurement of today’s mixTown release, May 29, 2026
Colorado River“Minimal reliance… approximately 10%” of supplyTown water-future page, Sept. 2026
Harquahala Valley groundwaterThe Town totals two 2025 purchases at 1.7 million acre-feet, to move on the existing CAP canal; it says it approved funding the larger one in late 2025 and sold the financing in January 2026Town water-future page, Sept. 2026; Town release, May 29, 2026
GSC Farm / Cibola entitlement2,033.01 acre-feet a year of Colorado River water, flowing since 2023ADWR recommendation, Sept. 4, 2020; Town, July 2023
Recovered effluentFills park and private-development lakes instead of potable groundwaterTown water FAQ, Sept. 2026

Two caveats. The Town publishes those two percentages but no full split of the rest of the portfolio, so any tidy pie chart of Queen Creek water sources fills in blanks the Town has left blank. And an acre-foot, the unit every deal is written in, is defined by the Town as 325,851 gallons, “about enough to serve three homes annually.”

The reuse side is visible if you go looking. The lakes at Mansel Carter Oasis Park and Frontier Family Park, along with several private developments, are filled with recovered and recharged treated effluent rather than drinking-quality groundwater — the Town says so on its own water FAQ.

3.What Queen Creek Bought: the Cibola Transfer and Two Harquahala Deals

Queen Creek went out and bought water. The Town calls the GSC Farm transfer “the first Colorado River to Central Arizona transfer in 50 years” and the Harquahala move “the first designated basin transfer outside the Phoenix Active Management Area.” The deals are separate and at different stages.

Queen Creek’s purchased water supplies, deal by deal (September 2026)
DealWhat it securesPriceStatus
GSC Farm / Cibola entitlement2,033.01 acre-feet a year, in perpetuity (2,083.1 af originally proposed in 2019)One-time $24 millionFlowing since 2023; federal environmental review still under way at the Town’s October 2025 update
ADWR Harquahala transportation determinationUp to 5,000 acre-feet a year for up to 110 years, capped at 500,000 acre-feet totalA determination, not a purchaseGranted July 18, 2025 on a Feb. 28, 2024 application
First Harquahala purchase, May 2025500,000 acre-feet$38.6 millionReported by the Queen Creek Tribune — secondary
Second, larger Harquahala purchase, late 20251.2 million acre-feet, capped at 12,000 acre-feet a year$244.4 million: certificates of participation sold January 15, 2026, 40-year term at 4.9%, annual debt service $12.1 to $14.8 million; a $90 million WIFA loan at 3.9% over 30 years, first two years interest only, replaces part of themApproved and funded in late 2025 per the Town, financed January 2026; no delivery date published
Heads up

The “1.7 million acre-feet” headline on the Town’s water-future page is the Town’s own total for its two 2025 Harquahala purchases. The Town’s release of May 29, 2026 states that “in late 2025, the Town approved funding an additional 1.2-million-acre feet of water for $244.4 million,” paid for with certificates of participation sold on January 15, 2026 over a 40-year term at 4.9%, carrying annual debt service of $12.1 to $14.8 million; a $90 million WIFA loan at 3.9% over 30 years, the first two years interest only, replaces part of that borrowing. The Town dates the approval only to “late 2025” and publishes no day for it. The Town also says the combined purchases bring its portfolio to “90% drought-proof and only 6% reliant on local groundwater pumping,” which is the Town’s characterization of its own portfolio. Approved and financed is not the same as delivered: no Town source published as of September 2026 says this water is flowing yet.

The Cibola side has an open question too. Western Arizona municipalities sued the U.S. Bureau of Reclamation — not Queen Creek — and an Environmental Impact Statement was still running as of the Town’s October 2025 update, with the court allowing deliveries to continue meanwhile. Town Director of Water Resources Paul Gardner put the transfer’s 100-year value at “nearly 365,000 acre feet” with reuse, in July 2023.

None of this arrives in a new canal. Harquahala water moves on the existing CAP canal, which the Town describes as running north of the Harquahala Valley and past Queen Creek’s eastern border.

4.Does Queen Creek Have a 100-Year Assured Water Supply?

Yes for current customers, not yet for the Town as an institution, and the two are not the same claim. The Town’s FAQ states that “all current Town of Queen Creek residential water customers have a certificate of 100-year assured water supply through groundwater.” The Town itself is not an ADWR Designated Water Provider; as of a July 2023 statement it was “working toward becoming a designated provider by 2030.”

What bridges the gap is CAGRD membership. 89% of Queen Creek water customers are assessed a Central Arizona Groundwater Replenishment District fee on their property tax bill; the remaining 11% or so are exempt from the Arizona Groundwater Management Act. CAGRD is not a separate agency but “a special function of Central Arizona Project,” and the line item rides on the same bill as the rest of your Queen Creek property taxes.

The unresolved part sits on the development side. Roughly 10,000 platted or approved single-family homes carry no certificate of assured water supply and cannot be built until a renewable source is secured for them, on the Town’s FAQ as published in September 2026, following the state’s 2023 Phoenix-area groundwater findings. That constrains future subdivisions, not water already coming out of a tap.

Good to know

The short version for a buyer: an existing Queen Creek home on Town water has a 100-year assured water supply certificate today; a raw lot may not. Ask the Utilities Department at 480-358-3450 which category a specific parcel falls into before signing anything on undeveloped land.

5.Is Arizona in a Water Shortage, and Does It Reach Queen Creek?

Arizona is in a shortage; the local figure to hold on to is that the Town puts its own Colorado River reliance at “minimal… approximately 10%” of supply, on its water-future page as published in September 2026. The Town does not publish a percentage for the rest of the portfolio, and neither the Town nor the Central Arizona Project publishes a Queen Creek-specific effect from the 2026 reduction — so this page states the statewide numbers and the Town’s share, and stops there rather than estimating one.

The statewide arithmetic is CAP’s. Arizona is taking Tier 1 Colorado River reductions for 2026, and CAP puts the cut at 512,000 acre-feet — 30% of CAP’s normal supply, about 18% of Arizona’s Colorado River supply and just under 8% of Arizona’s total water use. Nearly all of the reduction falls on CAP water users, and mostly on agricultural ones.

Locally, the Town completed a 3-million-gallon storage facility in 2020 and has two more under construction as of September 2026. It credits its Waterfluence partnership with HOAs with saving “more than 47 million gallons” in the most recent year cited, though it does not date that figure.

6.What Queen Creek Water Actually Costs

Council approved a 15% water rate increase on July 16, 2025 — the first residential rate adjustment in more than 15 years — worth “$3-$6 per month for most residential customers.” The Town’s page gives two effective dates: the top says Aug. 27, 2025, the Next Steps section says “beginning with the Oct. 7 billing cycle.” It never reconciles them, so read it as approved in July 2025 and on bills by that fall.

Town of Queen Creek monthly minimum water charge by meter size (September 2026)
Meter sizeMonthly minimum, includes the first 1,000 gallons
3/4 inch$21.08
1 inch$35.65
1.5 inch$52.90
2 inch$88.55
3 inch$211.60
4 inch$350.75
6 inch$1,546.75
Usage charges: Town tiers against the Diversified flat rate (September 2026)
ChargeTown of Queen CreekDiversified Water Service Area
1,001 – 10,000 gallons$2.04 per 1,000 gal$3.65 per 1,000 gal, flat
10,001 – 20,000 gallons$2.73 per 1,000 gal$3.65 per 1,000 gal, flat
20,001 gallons and above$3.40 per 1,000 gal$3.65 per 1,000 gal, flat
3/4-inch monthly minimum$21.08$27.50

A worked example: 10,000 gallons a month on a 3/4-inch meter

Water alone is $39.44 a month at 10,000 gallons on a 3/4-inch meter. That is the figure to compare against another town, because it depends only on the meter and the month’s use. Sewer and trash ride the same Town bill, but the sewer half turns on a number the water half does not: the household’s average winter water use.

  1. Water delivery: the $21.08 minimum covers the first 1,000 gallons, then 9,000 gallons at $2.04 per 1,000 adds $18.36. Subtotal $39.44.
  2. Sewer: a $10.25 residential base plus $4.82 per 1,000 gallons, billed on 70% of average winter water use — not on this month’s use. Only if the winter average is also 10,000 gallons does that come to 7,000 billed gallons, or $33.74, for a $43.99 sewer line.
  3. Trash and recycling: $16.22 a month as a Waste Connections of Arizona line item on the Town bill, as listed on the Town’s Resident Resources page in September 2026.
  4. Running total: $99.65 before tax, and only on that same 10,000-gallon winter average. A household with a lower winter average pays the same $39.44 for water and less for sewer, so the combined figure falls. Water charges are then subject to Arizona state and local sales tax plus the Arizona Water Use Tax.
Good to know

The residential sewer charge is capped at $67.61 a month, a cap tied to 17,000 gallons and in place since July 2021. Because sewer volume is averaged off winter water use, a Queen Creek summer of heavy irrigation inflates the water half of the bill without dragging the sewer half up with it.

7.The Proposed Water Resource Fee and What It Replaces

On Sept. 17, 2026 the Town posted a Notice of Intent for a Water Resource Fee, proposed at $3.07 per 1,000 gallons in Year 1, that would replace the CAGRD assessment now riding on roughly 89% of customers’ property tax bills. It is not adopted. A public hearing with possible Council action is set for Wednesday, Nov. 18, 2026 at 6:30 p.m. in the Community Chambers, 20727 E. Civic Parkway.

Proposed Water Resource Fee, residential impact at 10,000 gallons a month (Notice of Intent, September 2026)
ItemAs proposed
Year 1 rate$3.07 per 1,000 gallons
Gross monthly impact at 10,000 gallons$30.70
After the residential and schools wastewater credit (40%)$18.42
Commercial or multifamily with landscaping80% credit
Commercial or multifamily without landscaping90% credit
Earliest effective dateJanuary 2027 for the non-capacity fees, first appearing on bills in March 2027

The package proposes more than the fee. Single-family tiers 1 and 2 would fall while tier 3 rises; multifamily moves to a uniform $1.50 per 1,000 gallons plus base, non-residential to $2.50, landscape to $4, hydrant to $9. Solid waste would rise $3.78 a month for every curbside customer, and one-time capacity fees would be added for new development. All of it awaits the Nov. 18, 2026 hearing, so build the range rather than the specifics into a Queen Creek cost-of-living estimate.

Heads up

The Town’s own “Securing Queen Creek’s Water Future” page gives two different figures for what paying CAGRD at the maximum allowable rate since 2018 has saved customers: $71 million in the main section and approximately $58 million in the FAQ further down the same page, both as published in September 2026. The Town does not reconcile them. Cite either one with that caveat attached.

8.Water Quality, Hardness and the Softener Question

Queen Creek tap water is hard: 6 to 17 grains per gallon town-wide, per the Town’s water FAQ. Fluoride is naturally occurring rather than added: the Town’s FAQ gives 0.4 to 0.6 parts per million, which the 2025 report corroborates rather than repeats — the report’s own measured range is non-detect to 0.70 ppm, average 0.55 ppm. Whether hardness justifies a softener is a household call; 6 to 17 grains is the number to price against.

On contaminants, the 2025 report records no violations for anything tested — arsenic, barium, chlorine, chromium, combined radium, fluoride, gross alpha, nitrate, sodium, total coliform, TTHMs, uranium, lead, copper, PFAS and lithium are all listed “No” under Violation. The Town also reported no lead or galvanized service lines requiring replacement, and obtained a lead-free validation waiver from ADEQ, “one of the first municipalities to do so.”

The report is published in English and Spanish and linked from the Town’s water quality page; quality questions go to 480-358-3459. The Town also brought annual sampling in house rather than hiring vendors, which it estimates saves $60,000 to $95,000 a year.

There is no published mandatory watering-restriction stage in Queen Creek. The conservation programs the Town publishes are voluntary and incentive-based — turf-conversion rebates, free classes, the Waterfluence HOA partnership and a leak-check tool — and the conservation line is 480-358-3455.

9.A Queen Creek Water Checklist Before You Close

  1. Confirm the provider by street address, not mailing city. The Town, the Town-run Diversified area and EPCOR all serve addresses reading “Queen Creek,” on three rate schedules.
  2. Ask which meter size serves the house. A 3/4-inch meter carries a $21.08 monthly minimum that covers the first 1,000 gallons; a 1-inch meter carries $35.65, whether the house uses the water or not.
  3. Ask whether a CAGRD assessment appears on the property tax bill. About 89% of customers pay it there today, and the proposed Water Resource Fee would move that cost onto the water bill.
  4. On a vacant lot, ask the Utilities Department whether the parcel holds a certificate of assured water supply. Roughly 10,000 platted single-family homes in town do not.
  5. Price hard-water treatment, or the maintenance it prevents: hardness runs 6 to 17 grains per gallon.
  6. Read the current Annual Water Quality Report, not a third-party rating site. The 2025 edition lists every tested contaminant with its violation status.

Water is only one of the things that changes at the town line. The Queen Creek and San Tan Valley comparison sets out the rest, from taxes to schools.

The 9 PM Spouse-Text Summary
Quick read on Queen Creek Water (Queen Creek):
Provider: Town of Queen Creek for most addresses, 480-358-3450 — EPCOR or the Town’s Diversified area further out.
Cost: $21.08/month minimum on a 3/4-inch meter plus $2.04 per 1,000 gallons — about $39.44 a month for water alone at 10,000 gallons. Add sewer and trash and it is about $99.65 before tax, but only if the household’s winter average is also 10,000 gallons, because sewer is billed on winter use.
Coming: a proposed $3.07 per 1,000 gallon Water Resource Fee, hearing Nov. 18, 2026, replacing the CAGRD line on the property tax bill.
Supply: 29 wells and about 10% Colorado River. The Town says it approved funding a second Harquahala Valley purchase of 1.2 million acre-feet for $244.4 million in late 2025 and financed it in January 2026, putting its two 2025 purchases at 1.7 million acre-feet; no delivery date for that water is published.
Catch: hard water at 6–17 grains per gallon, and the Town is not yet an ADWR Designated Water Provider.

Tip: Text this directly to your partner after touring the model homes.

Frequently Asked Questions

Who is the water company in Queen Creek, AZ?

For most of the incorporated town it is the Town of Queen Creek Water Division, a municipal utility at 22358 S. Ellsworth Road, 480-358-3450. EPCOR serves parts of the wider area, and the Town separately runs the Diversified Water Service Area in east San Tan Valley. To confirm which one bills a specific property, call 480-358-3450 with the street address — the mailing city does not decide it.

Where does Queen Creek get its water from?

From 29 active drinking-water wells, recovered surface water, and purchased Colorado River and Harquahala Valley supplies. The Town puts Colorado River reliance at about 10% of supply. It says it approved funding a second Harquahala purchase of 1.2 million acre-feet for $244.4 million in late 2025 and financed it in January 2026, bringing its two 2025 purchases to 1.7 million acre-feet and its portfolio to “90% drought-proof and only 6% reliant on local groundwater pumping.” That 90 and 6 split is the Town’s own characterization, not a measurement of today’s mix, and no delivery date for the purchased water is published.

Does Queen Creek, AZ have water issues?

Not in the sense of supply interruptions or quality violations: the Town says all current residential water customers hold a 100-year assured water supply certificate, and the 2025 quality report lists no violations for anything it tested. The live issues are cost and hardness — a 15% rate increase already on bills, a Water Resource Fee proposed for a Nov. 18, 2026 hearing, and hardness of 6 to 17 grains per gallon — plus roughly 10,000 platted homes that cannot be built without a renewable source.

Is Arizona experiencing a water shortage?

Yes. Arizona is taking Tier 1 Colorado River reductions for 2026 — 512,000 acre-feet, or 30% of the Central Arizona Project’s normal supply, per CAP. Nearly all of that cut falls on CAP water users, mostly agricultural ones.

How do I pay a Queen Creek water bill?

Mailed payments go to the Town of Queen Creek, P.O. Box 29014, Phoenix, AZ 85038-9014. The Utilities Department takes calls at 480-358-3450, Monday through Thursday, 7 a.m. to 6 p.m., and lists current payment options on its water page.

Is Queen Creek water hard?

Yes — 6 to 17 grains per gallon town-wide, per the Town’s water FAQ as published in September 2026. Fluoride is naturally occurring at 0.4 to 0.6 parts per million rather than added to the supply.

Does Queen Creek have mandatory watering restrictions?

No mandatory drought-stage schedule is published by the Town. Its conservation programs are voluntary and incentive-based: turf-conversion rebates, free classes, the Waterfluence HOA partnership and a leak-check tool. The conservation line is 480-358-3455.

Is Queen Creek tap water safe to drink?

The Town’s 2025 Annual Water Quality Report records no violations for any contaminant it tested, including arsenic, nitrate, uranium, PFAS, lead and copper. The Town also reports no lead or galvanized service lines requiring replacement anywhere in its system.

Keep Reading

Setting up utilities before a Queen Creek move?

The 30-Day Relocation Checklist covers the Town utility signup steps, the meter-size and CAGRD questions to ask before closing, and the November 2026 rate-hearing date to watch.

Sources & verification

  1. Town of Queen Creek — Water Division — accessed September 20, 2026
  2. Town of Queen Creek — Securing Queen Creek’s Water Future — accessed September 20, 2026
  3. Town of Queen Creek — news release on the Harquahala purchase financing, May 29, 2026 — accessed September 20, 2026
  4. Town of Queen Creek — GSC Farm / Cibola water transfer — accessed September 20, 2026
  5. Arizona Department of Water Resources — Harquahala transportation determination, July 18, 2025 — accessed September 20, 2026
  6. ADWR — Proposed transfer of GSC Farm LLC’s Colorado River entitlement to Queen Creek — accessed September 20, 2026
  7. Town of Queen Creek — 2025 Water Rate Increase — accessed September 20, 2026
  8. Town of Queen Creek — Water Rates and Fees — accessed September 20, 2026
  9. Town of Queen Creek — Diversified Water Utility Service Area rates and fees — accessed September 20, 2026
  10. Town of Queen Creek — Sewer rates and fees — accessed September 20, 2026
  11. Town of Queen Creek — Water frequently asked questions — accessed September 20, 2026
  12. Town of Queen Creek — Water quality — accessed September 20, 2026
  13. Town of Queen Creek — 2025 Annual Water Quality Report — accessed September 20, 2026
  14. Town of Queen Creek — Utility service area exchange with EPCOR — accessed September 20, 2026
  15. Town of Queen Creek — Notice of public hearing on the Water Resource Fee, Sept. 17, 2026 — accessed September 20, 2026
  16. Town of Queen Creek — Resident Resources utility contacts — accessed September 20, 2026
  17. Town of Queen Creek — Council approval of the H2O, Inc. water utility purchase, June 2013 — accessed September 20, 2026
  18. Arizona Department of Environmental Quality — EPCOR San Tan water and wastewater — accessed September 20, 2026
  19. Central Arizona Project — Colorado River operations and the 2026 shortage tier — accessed September 20, 2026
  20. Central Arizona Groundwater Replenishment District — About CAGRD — accessed September 20, 2026
  21. Queen Creek Tribune — How Queen Creek will fund its $244.4M water deal (secondary) — accessed September 20, 2026

Updated 2026-09-20 · Originally published 2026-09-20 · The Queen Creek Local Desk